ENSR|AECOM
 
MARKETS/SERVICES
  Industry Sectors
  Federal/Gov. Svcs.
  Air Quality Management
  Capital Permitting
  Environmental Mgt/
Due Diligence
Remediation/Site Closure
    Site Assessment
    Site Remediation
      Guaranteed Remediation
      Vapor Intrusion
      Technology Evaluations
      Mfg Gas Plants
      RCRA/CERCLA
      Manufacturing Site Remediation
      Phytoremediation of Groundwater
    Sediments
    Brownfields Mgt.
    Storage Tank Mgt.
    Construction Mgt.
    Risk Assess/Toxicology
  Water/Natural Resources
  Sustainability Services
  Capabilities A-Z

ENSR vital statistics:

  • 2,600 employees
  • Offices in 15 countries
  • 90 locations
  • Founded in 1968
  • Completed over 100,000 projects
  • Over 40 languages spoken
  • Expertise in over 60 technical disciplines

Now with the greater resources and reach of AECOM!

Contact Us

Europe

+39.02.3180.771

Asia 

+852.2893.1551

Australia

+61.2.8484.8999

Latin America

+55.21.2005.3677

N.  America

1.800.722.2440

 

Manufactured Gas Plant Services

Jump to Project

ENSR has worked hand-in-hand with utilities and other companies to address environmental issues associated with Manufactured Gas Plants (MGP) and coal tar impacted sites since the early 1980’s. From that experience we have developed a thorough understanding of the environmental issues that arise from common past practices at many old MGP and coal tar sites.

ENSR has consulted on more than 50 MGP sites in 12 states, with a long track record of Closures with No Future Action required.

  • Remedial/Site Investigation
  • Risk Assessment
  • Feasibility Studies
  • Remedial Design
  • Remediation
  • Fenceline Monitoring

MGP Site Remediation Monitoring Project

ENSR is currently conducting a fenceline air monitoring program in conjunction with the remediation of a former Manufactured Gas Plant (MGP) site. Measurement parameters include particulates, total VOCs, specific VOC’s and PAHs using US EPA analytical methods TO-14 and TO-13. Speciation for the BTEX compounds is also performed using field GCs at eight monitoring stations. Continuous air quality data are transmitted to a central location via radio frequency telemetry. Continuous meteorological data are integrated into the sample program to determine upwind and downwind sample stations on a real-time basis.

ENSR’s fenceline measurement system simultaneously monitors several chemical compounds and pollutant media. The systems are transportable and can be rapidly reassigned to up to 19 locations in the remediation area. The ENSR measurement system design will greatly expedite the clean up of potentially contaminated soils in this urban setting by providing real-time information to the remediation contractor. Moreover, it will provide reduced liabilities for the property owner associated with the public’s potential exposure to airborne site contaminants.

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer